Fill Dirt 10 RECOMMENDED BASE STABILIZATION – one
$16.26
Description
RECOMMENDED BASE STABILIZATION – one layer of DriveGrid™" stabilization grid between subgrade and base material
Alternative Permeable Bedding Course – 1” thick of 1/4” clear open-graded chip stone – (ASTM No
85 Linear Ft Per Sq Ft - Sailor
swimming pools
Fill Dirt 10 RECOMMENDED BASE STABILIZATION – oneFill Dirt: Sold By The Yard: 10 x 10 x 2" Fill dirt is usually subsoil and underlying soil parent material which has little soil organic matter or biological activity. Fill dirt is taken from a location where soil is being removed as a part of leveling an area for construction; it may also contain sand, rocks, stones, concrete, etc
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 12.00
US$ 12.00
US$ 18.00
US$ 18.00
US$ 10.00